Consultation of Engineering Cost

Preparation, review and reexamination of engineering estimate

Collect and be familiar with the project related data; conduct site survey; prepare the total investment and its composition of the construction project according to the characteristics of the construction project, the scheme design documents and the corresponding engineering cost valuation basis or data; analyze the main technical and economic indicators of the project; cooperate with the audit work of the project investment estimation (if necessary); check the integrity and compliance of the data; prepare the audit according to the Correctness of basis, applicability of preparation method, consistency of preparation content and requirements; accuracy, comprehensiveness and rationality of audit cost; responsible for organizing site survey, audit meeting and other audit related work; sorting out relevant records, such as agreed major event meeting discipline, expert opinion, etc.

Preparation, review and reexamination of budget estimate (adjusted budget)

Collect and be familiar with the relevant data of the project; conduct site survey; participate in the review meeting of preliminary design documents and put forward relevant economic and reasonable suggestions; prepare the total estimated investment of the construction project and its composition according to the characteristics of the construction project, the preliminary design documents and the corresponding pricing basis or data of the project cost; divide the technical and economic indicators of each single project and main unit project Analyze; compare the difference between the design estimate and the investment estimate, analyze the main reasons; cooperate with the audit of the project design estimate (if necessary). Check the completeness and compliance of data; check the legality, timeliness and scope of application of preparation basis; check the accuracy, comprehensiveness and rationality of construction and installation engineering cost (such as engineering quantity, quota application, material unit price, measure cost, engineering index, etc.); check the accuracy, comprehensiveness and rationality of other construction cost, reserve cost, loan interest during construction, etc Be responsible for organizing site survey, review and verification, work coordination meeting and other audit related work; sort out relevant records, such as meeting minutes of agreed disagreements, expert opinions, etc.

Budget preparation, review and review

Collect and be familiar with project related data; conduct site survey; attend design document review meeting (if necessary); calculate engineering quantity, survey material or equipment market price; prepare according to design document, engineering technical document, construction organization design, construction scheme, site survey, project cost information, market price information and relevant supporting documents issued by project cost management organization Construction drawing budget; comparative analysis with engineering project design budget; engineering technical and economic index analysis. Check the integrity and compliance of the data; conduct site survey; review the legality, correctness, timeliness and scope of application of the basis for preparation; review the construction drawing in advance according to the geological survey data, design documents, engineering technical documents, construction organization design, construction scheme, site survey, project cost information, market price information and relevant supporting documents issued by the project cost management organization Calculation; comparative analysis with engineering project design budget; analysis of engineering technical and economic indicators.

Preparation, review and reexamination of settlement

Collect and be familiar with the project related data, put forward opinions and suggestions on the incomplete data; conduct site survey; calculate the quantities and related costs, form the first draft; consult the opinions of the client, adjust and form the outcome document; cooperate with the client to complete the settlement audit. Review the project completion settlement preparation stage to collect the completion settlement data; review the project settlement data; review the correlation and validity of the pricing basis and data with the project settlement; hold the pre audit meeting; review the site survey in the project completion settlement review stage; review the consistency of the scope and content of the settlement project with the project scope and content agreed in the construction contract; review the calculation of the project quantity The accuracy and quantity calculation rules shall be consistent with the pricing specifications or quotas; the pricing principles and methods of the settlement unit price shall be reviewed; the settlement unit price of new materials and new processes shall be reviewed; the authenticity, legality, validity and integrity of the change certificate shall be reviewed; the change project cost shall be approved; whether the claim is handled according to the claim handling principles, procedures and calculations stipulated in the contract shall be reviewed Methods and the authenticity, legality and accuracy of claim cost; review the difference adjustment of labor cost; review the difference adjustment of material price; review the charging standard (security cost, fees, taxes, etc.); review the cost of other projects; prepare the settlement review comparison table corresponding to the settlement; internal review by the trustee; submit the preliminary results of the completion settlement review. Hold a post audit meeting at the stage of audit of project completion settlement; determine the settlement audit conclusion; and issue a formal settlement audit report.

Preparation, review and reexamination of bill of quantities

Collect and be familiar with the project related data; conduct site survey; attend the design document review meeting (if necessary); verify the bidding scope, bidding interface and other relevant contents in the bidding document, and provide the owner with consultation opinions on the items in the bill of quantities; calculate the quantities; according to the design documents, engineering technical documents, construction schemes of similar projects, site survey conditions and projects Prepare bill of quantities for relevant supporting documents issued by cost management organization; check the completeness and compliance of materials; review the legality, correctness, timeliness and scope of application of preparation basis; prepare construction scheme, site survey and relevant supporting documents issued by project cost management organization according to geological exploration materials, design documents, bidding documents, engineering technical documents, similar projects Review the bill of quantities of components; prepare the bill of quantities review report;

Preparation, review and reexamination of bidding control price

Collect and be familiar with project related data; conduct site survey; attend design document review meeting